Back to Top

Guidelines for New Service Connection


  • No fee as Service Connection Charge is required for name change of consumers

  • Security Deposit (SD) is applicable as per contractual load & current tariff. However, only rest amount as SD needs to be paid if the existing consumer is willing to transfer the SD amount available with WBSEDCL. It is also to be noted that this SD is not a fee as it is adjustable/refundable. To know the value of SD, please click here

  • To Apply Online, please click here





1) User Registration

Applicant / User has to register himself / herself through a simple self registration process by giving Name, user ID (of his/her choice in case of Industrial consumer only), Mobile No (The mobile no is used as the user id for other that Industrial consumers) and email ID.


2) Log-in and Onward Process

Applicant / User needs to log in the system with user ID and password. After successful login, applicant may change his / her password. In the application page, applicant needs to select the area/district where he/she belongs. After selection, the list of the Customer Care Centre will be displayed from where user needs to select the right Customer Care centre. User is requested to click on the link provided here as tips.

3) Application form submission

Applicant / User needs to fill up all the details provided in the application page and submit the same.


Tips for applied load upto 50 KVA
Customer Care Centre (CCC):
User can check nearby locality and get their Customer Care Centre. User's Customer Care Centre might be same as them. For more information, User can contact Toll Free Numbers (available in website).
Rural / Urban
Generally locality covered under Municipality / Corporation, are considered as Urban area.

Applicant can upload below document along with a passport size photo of applicant:

A. Proof of Identity : Passport / Voter ID / Aadhaar Card / Driving License / PAN Card / other photo identity card issued by any Govt. Agency

B. Proof of ownership / Legal Occupancy : Sale Deed / Lease Deed / Rent Deed / Tax Receipt of Panchayat or Municipality or Municipal Corporation / Telephone Bill / Rent Bill / Rent Control Challan / Documents issued by any Ministry or Department of Govt. showing occupancy


On submission of application (on-line), instant Provisional quotation for service connection & Security Deposit will be generated from system for the intending consumer having application no. (10 digit) and he/she may download the quotation letter.


The Quotation amount may be paid through e-payment gateway in net-banking/debit/credit card mode in the WBSEDCL Web portal/Mobile APP and may download the payment receipt or alternatively applicant may deposit payment at concerned Customer Care Centre.



Technical feasibility

After deposition of Quotation amount, authorized representative of WBSEDCL will inspect the premises within 3 days from date of deposition of quotation amount to ascertain:


1) Whether any connection already exists (live / disconnected)?
If exists, then:
     i) is the particular premises (new one) is physically separate from the existing premises (old one) along with electrical wiring?
     ii) is there any O.S.D. against the old connection?


2) Whether the existing system capable to deliver the demand loads?
3) Whether any maintenance jobs require to be done on the existing system?
4)Whether there is any Way Leave problem?
5) Whether the Intending Consumer has completed his portion of work i.e. : Readiness of premises, Installation of Main Switch, Installation of earthing, Completed the wiring etc.

In case the applicant unable to submit the required documents online during application , the same will be collected during inspection.



If any deviation is found, it will be intimated in due course.



Effecting Service Connection

On completion of statutory formalities by the prospective consumer , WBSEDCL will execute the service connection work within 7 days.






Application Form (Procedure A ) can be downloaded from here .



On collection, the said form is to be submitted duly filled in along with the following documents to concerned office:


i) Proof of Identity : Passport / Voter ID / Aadhaar Card / Driving License / PAN Card / other photo identity card issued by any Govt. Agency
ii) Proof of ownership / Legal Occupancy : Sale Deed / Lease Deed / Rent Deed / Tax Receipt of Panchayat or Municipality or Municipal Corporation / Telephone Bill / Rent Bill / Rent Control Challan / Documents issued by any Ministry or Department of Govt. showing occupancy

All the documents will be verified by the concerned office and a Quotation for Service Connection Charge and Security Deposit will be issued.


The Service Connection Charge and Security Deposit shall have to be deposited at concerned office during cash hours within 90 days from the date of issuance of quotation.
OR
Consumer can also deposit that service connection charge and security deposit online using website/Mobile App of WBSEDCL



Technical feasibility

After deposition of Quotation amount, authorized representative of WBSEDCL will inspect the premises within 3 days from date of deposition of quotation amount to ascertain:


1) Whether any connection already exists (live / disconnected)? If exists, then:
     i) is the particular premises (new one) is physically separate from the existing premises (old one) along with electrical wiring?
     ii) is there any O.S.D. against the old connection?

2) Whether the existing system capable to deliver the demand loads?
3) Whether any maintenance jobs require to be done on the existing system?
4) Whether there is any Way Leave problem?
5) Whether the Intending Consumer has completed his portion of work i.e. : Readiness of premises, Installation of Main Switch, Installation of earthing, Completed the wiring etc.

If any deviation is found, it will be intimated in due course.

Effecting Service Connection

On completion of statutory formalities by the prospective consumer , WBSEDCL will execute the service connection work within 7 days.







Requirement of Earnest Money Deposit i.e. EMD amount for new connection with the jurisdiction of power connection depending upon the Contract Demand is appended below:


Category of Consumer depending on Contract Demand (C.D) Amount of Earnest Money Jurisdiction of connection
11 KV, C.D above 200 KVA but less than 1500 KVA Rs 5,000/ Region Office
33 KV, C.D above 1500KVA but less than 15 MVA Rs 20,000/- Central Commercial Department, Vidyut Bhavan
132 KV, C.D above 15 MVA Rs 1,00,000/- Central Commercial Department, Vidyut Bhavan


1) User Registration

Applicant / User has to register himself / herself through a simple self registration process by giving Name, user ID (of his/her choice ), Mobile No and email ID.


2) Log-in and Onward Process

Applicant / User needs to log in the system with user ID and password. After successful login, applicant may change his / her password. In the application page, applicant needs to select the area/district where he/she belongs. User is requested to click on the link provided here as tips.


3) Application form submission

Applicant / User needs to fill up all the details provided in the application page and submit the same.

Tips
Region Office (R.O) :
User can check nearby locality and get their Region Office in case of Contract Demand (C.D) 50 KVA and upto less than 1500 KVA. For Contract Demand 1500 KVA & above application is to be made before Central Commercial Department only. For more information, user can contact toll Free Numbers (available in website).

Applicant can upload below document along with a passport size photo of applicant:

A. Proof of Identity : Passport / Voter ID / Aadhaar Card / Driving License / PAN Card / other photo identity card issued by any Govt. Agency

B. Proof of ownership / Legal Occupancy : Sale Deed / Lease Deed / Rent Deed / Tax Receipt of Panchayat or Municipality or Municipal Corporation / Telephone Bill / Rent Bill / Rent Control Challan / Documents issued by any Ministry or Department of Govt. showing occupancy


In case of applied load up to 200 KVA, instant Quotation Letter will be generated. For applied load above 200 KVA next steps need to be followed.


On submission of application (on-line), instant quotation for EMD will be generated from system for the intending consumer having Application No. and he/she may download the quotation letter.


The Quotation amount i.e. EMD may be paid through e-payment gateway using net-banking/debit/credit card mode at WBSEDCL Web portal and may download the payment receipt or alternatively applicant may deposit payment at concerned Region Office / Central Commercial Department, as the case would be depending upon the Contractual Demand (CD).


Click here for manual


Application Form may be collected by the intending consumer with a written request to the Region Office for a Contract Demand (C.D) = 50 KVA & above but <1500 KVA.
OR
However for C.D = 1500 KVA and above, application form is to be collected from Central Commercial Department. The concerned office will issue the Application Form at Free of Cost.


Applicant should fill up the form and paste one passport size photograph on the marked area of the said form. This filled up form should be submitted along with the following documents to concerned office:
i) Proof of Identity : Passport / Voter ID / Aadhaar Card / Driving License / PAN Card / other photo identity card issued by any Govt. Agency
ii) Proof of ownership / Legal Occupancy : Sale Deed / Lease Deed / Rent Deed / Tax Receipt of Panchayat or Municipality or Municipal Corporation / Telephone Bill / Rent Bill / Rent Control Challan / Documents issued by any Ministry or Department of Govt. showing occupancy


In case of applied load up to 200 KVA, Quotation Letter will be generated. For those cases please skip to “Deposition of Service Connection Charge & Security Deposit” step. For applied load above 200 KVA next steps will be followed.


The Amount of Earnest Money shall have to be deposited during cash hours within 15 days from the date of issuance of quotation against Quotation issued.





On receipt of application, an Inspection will be conducted by the Commercial Officer of Region / Central Commercial Department for Techno-Commercial Feasibility study and also will enquire:


1) Whether any connection already exists (live / disconnected)? If exists, then he/she will enquire:
     i) is the particular premises (new one) is physically separated from the existing premises (old one) along with electrical wiring?
     ii) is there any outstanding dues against the old connection?

2) Whether the existing system is capable to deliver the load demand?
3) Whether the Intending Consumer has completed his portion of work for readiness of premises.

In case the applicant unable to submit the required documents online during application , the same will be collected during Inspection.


Quotation will be generated according to their applied load as follows:
     a) For applied load up to 200 KVA, instant quotation will be generatedbased on applied load.
     b) For applied load above 200 KVA, during the inspection, if above stated conditions have found to be satisfied well, a Quotation for Service Connection and Security Deposit will be issued in due course.


The Service Connection Charge & Security Deposit can be deposited in form of cash at our concerned office (RO/Central commerce dept.) during cash hours within or through RTGS/NEFT to designated Bank account of WBSEDCL. Security deposit can also be submitted in the form of Bank Guarantee to concerned office. However the quotation amount can only be deposited within 90 days from the date of issuance of quotation.


An Agreement is to be executed as per the Standard Format.


After completion of new installation / augmentation job related to the Bulk connection, the completion report will be submitted by the agency to the concern Division office which will in turn be communicated to Region / Central Commercial Office. The Division Office will simultaneously arrange to place proposal before Electrical Inspector for their approval against WBSEDCL portion of installation.


     i) In case of C.D < or=200 KVA, connection will then be effected from concern Region office without the E.I approval
     ii) In case of C.D > 200 KVA, on receipt of E.I approval from the intending consumer (for Consumer’s installation), Commercial Clearance will be issued from concerned Region / Central Commercial Department.

On completion of statutory formalities by the prospective consumer , WBSEDCL will execute the service connection work within 7 days.


If needed, after deposition of Earnest money quotation, the intending bulk consumer may approach to concern Customer Care Center with the consent letter from concern Region / Central Commercial office for Construction Power separately, observing all necessary formalities as applicable for intending industrial consumer.







1) User Registration

Applicant/User has to register himself/herself through a simple self registration process by giving Name, Mobile No (will be the user id for the consumer) and email ID


2) Log-in and Onward Process

Applicant/User needs to log in the system with user ID (mobile no) and password. After successful login, applicant may change his/her password. In the application page, applicant needs to select the region/district where he/she belongs. After selection, the list of the Customer Care Centre will be displayed from where user needs to select the right Customer Care centre. User is requested to check the tips below.


Tips
Customer Care Centre (CCC) :
User can check nearby locality and get their Customer Care Centre. User's Customer Care Centre might be same as them. For more information, user can contact toll Free Numbers

3) Application form submission

Applicant/User needs to fill up all the details provided in the application page and submit the same. Application need to be submitted at least 2 days before the starting date of connection.







Application Form may be collected from concerned Customer Care Center of WBSEDCL.

or

Download Application Form now




On collection, the said form is to be submitted, at least 2 days before the starting date of connection, duly filled in along with the documents mentioned in the application form.




Authorized representative of WBSEDCL will inspect the premises to ascertain:


1) Whether any connection already exists (live / disconnected)? If exists, then:
     i) is the particular premises (new one) is physically separate from the existing premises (old one) along with electrical wiring?
     ii) is there any O.S.D. against the old connection?


2) Whether the existing system capable to deliver the demand loads?
3) Whether any maintenance jobs require to be done on the existing system?
4) Whether there is any Way Leave problem?
5) Whether the Intending Consumer has completed his portion of work i.e.: Readiness of premises, Installation of Main Switch, Installation of earthing, Completed the wiring etc.

Documents mentioned in the Application Form will be collected from applicant by authorized representative of WBSEDCL during Inspection.



After duly filled Application Form submission by applicant & satisfactory inspection by WBSEDCL officials, a Quotation for Service Connection and Security Deposit will be issued.



The Service Connection Charge and Security Deposit shall have to be deposited at concerned Customer Care Center during cash hours within 90 days from the date of issuance of quotation.

OR

Consumer can also deposit that service connection charge and security deposit online using website of WBSEDCL or user can pay the quotation via online RTGS/NEFT.



After deposition of Service Connection Charge and Security Deposit, observations at the premises about its readiness & clear status, connection will be effected as per consumer's application.





Application Form ( Procedure B ) can be downloaded from here .


On collection/downloading , the said form may be filled up and may be submitted along with following documents to concerned Customer Care Center:

i) One passport size photograph
ii) Proof of Identity : Passport / Voter ID / Aadhaar Card / Driving License / PAN Card / other photo identity card issued by any Govt. Agency
iii) In-principle clearance from Pollution Control Board Concerned, if applicable
iv) Proof of ownership / Legal Occupancy : Sale Deed / Lease Deed / Rent Deed / Tax Receipt of Panchayat or Municipality or Municipal Corporation / Telephone Bill / Rent Bill / Rent Control Challan / Documents issued by any Ministry or Department of Govt. showing occupancy
v) Self certification of installation of capacitor at incoming side of service connection but after the meter in relation to the common service part having contract demand of 10 KVA or above
vi) The detail list of electrical equipments with number and corresponding wattages as per following table :

Sl. No Item Minimum Project Load
1 Water Pump 2 KW
2 Lift 6 KW
3 Stair Case 60 watt per floor per set of stair case
4 Community Hall ( if any) 5 KW
5 Common Passage/space 2 KW
6 Single Room Flat/Apartment Blocks/Dwelling unit 1 KW
7 Two Room Flat/Apartment Blocks/Dwelling unit 2 KW
8 Three Room Flat/Apartment Blocks/Dwelling unit 4 KW
9 For Flat/Apartment Blocks/ Dwelling units having more than Three room 4 KW + additional 1 KW for each room in excess of 3 room
10 For commercial space/Establishment 2 KW per 1000 sq.ft or part there of


Application is to be received from old habitats opting notional suspension/disconnection as the case may be. After realizing the final bill(s) / outstanding Dues (if any) of the existing Connection (s) dismantling is to be done i.r.o the disconnected service connection(s).When the premises is free from all obligation including matter related to service connection then the procedure can start for new service connection(s) in line with Procedure B.


After application submission, authorized representative of WBSEDCL will inspect premises to ascertain:


1) Whether any connection already exists (live / disconnected)?
If exists, then:

     i) Is the particular premises (new one) is physically separate from the existing (old one)?
     ii) is there any O.S.D. against the old connection?

2) Whether the existing system capable to deliver the demand loads?
3) Whether the maintenance jobs require to be done on the existing system?
4) Whether the Intending Consumer has completed /started his portion of work i.e.: readiness of premises etc.

If any deviation is found, it will be intimated in due course with provision of execution in Turnkey mode, if required.


If above mentioned conditions are satisfied a Quotation for Service Connection and Security Deposit will be issued. In case of non-availability of material, required for such infrastructure, in order to expedite the connection in line with the time frame laid down by the regulation, WBSEDCL shall initiate an offer of completing the infrastructure work on TURNKEY basis by the developer of the complex as per terms and conditions as laid down in the said offer. Such offer of TURNKEY shall be issued along with the Quotation. In case of Turnkey execution, both Supply & Material and engagement of Agency shall have to conform to WBSEDCL guideline.


It has to be provided by the Developer the common space with properly illuminated and properly ventilated which should be free from any hindrances for installing the required meter(s).


The amount of Service Connection Charge & Security Deposit shall have to be deposited at concerned Customer Care Center during cash hours within 90 days from the date of issuance of quotation.


After deposition of the amount of Service Connection Charge & Security Deposit the connection will be effected as follows:

     i) The required common connection for the Housing Complex or Commercial Complex
     ii) For individual service connection, the occupier or owner of each dwelling units or commercial units of the said complex shall have to apply as intending consumers of the dwelling unit/commercial unit in accordance with WBSEDCL PROCEDURES-A